Infrastructure
Applications include:
- Tunnel segment linings.
- Shotcreting of temporary and final tunnel linings.
- Pavements, roundabouts, curbs and channels.
- RTA approved.
ReoCo’s high quality fibres have been used to replace traditional mesh reinforcement in infrastructure applications, tried and tested for Australian conditions. ReoPave25 has been approved for use in RTA applications.
| Infrastructure Case Studies | Hydro Tunnel - Shotcrete |
|---|---|
| Jetty Edge Beam | |
| RTA Road Pavement | |
| Heavy Duty Pavement | |
| Wall Stabilisation - Shotcrete | |
| Heavy Duty Pavement |
Hydro Tunnel - Shotcrete
![[images/hydro_tunnel.jpg]](images/hydro_tunnel.jpg)
Bogong Power Station Victoria.
| Tunnel thickness: | 125mm 40 MPa |
| Fibre: | Reoco65/35 Steel Fibres |
| Dose: | 25kg / m3 |
Jetty Edge Beam
![[images/ulladulla_jetty.jpg]](images/ulladulla_jetty.jpg)
Ulladulla - South Coast NSW.
| Beam thickness: | 350mm x 400mm x 100m |
| Fibre: | Forta Ferro Polypropylene Fibres |
| Dose: | 4kg / m3 |
RTA Road Pavement
![[images/hume_highway.jpg]](images/hume_highway.jpg)
Hume Highway Marulan NSW.
| Pavement thickness: | 300mm 40MPa |
| Fibre: | Reopave25 Steel Fibres |
| Dose: | 75kg / m3 |
Heavy Duty Pavement
Chatswood Interchange NSW.
| Pavement thickness: | 210mm 40MPa |
| Fibre: | Forta Ferro Polypropylene Fibres |
| Dose: | 4kg / m3 |
Wall Stabilisation - Shotcrete
![[images/wall_stabilisation.jpg]](images/wall_stabilisation.jpg)
Wetherill Park NSW.
| Shotcrete thickness: | 75 - 100mm 32MPa |
| Fibre: | Reoshore58 Polypropylene Fibres |
| Dose: | 7kg / m3 |
Heavy Duty Pavement
![[images/banksmeadow.jpg]](images/banksmeadow.jpg)
Banksmeadow NSW.
| Pavement thickness: | 300mm 40MPa |
| Fibre: | Reoco 80 / 60 Steel Fibres |
| Dose: | 40kg / m3 |
-