Infrastructure

Applications include:

  • Tunnel segment linings.
  • Shotcreting of temporary and final tunnel linings.
  • Pavements, roundabouts, curbs and channels.
  • RTA approved.

ReoCo’s high quality fibres have been used to replace traditional mesh reinforcement in infrastructure applications, tried and tested for Australian conditions. ReoPave25 has been approved for use in RTA applications.

Infrastructure Case StudiesHydro Tunnel - Shotcrete
Jetty Edge Beam
RTA Road Pavement
Heavy Duty Pavement
Wall Stabilisation - Shotcrete
Heavy Duty Pavement

Hydro Tunnel - Shotcrete

[images/hydro_tunnel.jpg]

Bogong Power Station Victoria.

Tunnel thickness:125mm 40 MPa
Fibre: Reoco65/35 Steel Fibres
Dose:25kg / m3

Jetty Edge Beam

[images/ulladulla_jetty.jpg]

Ulladulla - South Coast NSW.

Beam thickness:350mm x 400mm x 100m
Fibre: Forta Ferro Polypropylene Fibres
Dose:4kg / m3

RTA Road Pavement

[images/hume_highway.jpg]

Hume Highway Marulan NSW.

Pavement thickness:300mm 40MPa
Fibre: Reopave25 Steel Fibres
Dose:75kg / m3

Back to Top

Heavy Duty Pavement

Chatswood Interchange NSW.

Pavement thickness:210mm 40MPa
Fibre: Forta Ferro Polypropylene Fibres
Dose:4kg / m3

Wall Stabilisation - Shotcrete

[images/wall_stabilisation.jpg]

Wetherill Park NSW.

Shotcrete thickness:75 - 100mm 32MPa
Fibre: Reoshore58 Polypropylene Fibres
Dose:7kg / m3

Heavy Duty Pavement

[images/banksmeadow.jpg]

Banksmeadow NSW.

Pavement thickness:300mm 40MPa
Fibre: Reoco 80 / 60 Steel Fibres
Dose:40kg / m3

Back to Top


-